Home
Thanks to another referral we are close to breaking ground on another project in the South End.
Though not as glamorous as some of our other major renovations, this one is equally important to condo owners and tenants.
Scope of work includes:
  • Opening up basement walls in basement to expose foundation and coal bin.  As with all of demolition extreme care is given to install the proper floor protection, wall protection and dust barrier systems.  We also run a negative air system with a HEPA filter during the actual demolition.
  • Conducting an evaluation, then managing the remediation of mold and mildew
  • Replace any rot, re-point foundation walls, install a vapor barrier and air seal, and improve the building envelope
  • After completion of shell repairs we will close up the walls and re-finish the master bedroom in the basement
Stay posted for more updates soon!
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s