Home

Clever Green Cabinets have done it again !!

Jon Taylor first created a kitchen design that the client loved, then realized it by building, staining and installing the cabinetry. Clever Green first installed the base-cabinets unfinished  with all the face frames to be able to template early. Jon’s team then removed the face frames and applied the stain and finish in their spray booth. This ensured a consistent finish.

Some of the cool products installed on this project are the Blue Star range, 8” wide oak flooring and Ashfield schist stone.

The icing on the cake for this project just came on site. The hand-made and painted backsplash tile from Tile Showcase that took 7 weeks to arrive  and will be installed next week.

We will complete a project re-cap once the backsplash is installed.


Advertisements

2 thoughts on “JP Kitchen Project Update

    • Thank you. It feels good to be able to execute a great design by our sister company Clever Green Cabinets. The fact that it was built locally w/ healthy products is the icing on the cake. -John

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s