We received the green light to start a large scale renovation of a house in serious need of  upgrades in Somerville last week.

Our scope:
First Floor: To create an open floor plan by removing all the partition walls; kitchen, ½ bath, flooring and removing the lowered ceilings

Second floor: new master suite, full bath, flooring

Attic: upgrade finishes and add 3 Velux skylights

Basement: dig out half the existing basement slab to create a level surface and pour a new slab; install closed cell foam on the blockers (area where floor joists meets the foundation wall).

General: Upgrade electrical, plumbing, mechanicals, roof, windows, insulation Rough-in for Solar PV.

We will wrap up demo this week. The electrical walk-through is scheduled for next week, followed soon after by rough-ins for the mechanicals.

The project team:
Project Manager: Ryan Barr
Project Arch:Hans Strauch of HDS Architecture 
Project Engineer:   Scott Nelson of Structural Response

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s