We have water!!!!!! At a depth of 720’ we hit the required GPM (gallons per min.) The first 7′ was sub-soil and the remaining 613’ was bedrock. NorthEast Water Well Co. drilled  the well for about 5 days the first week of Dec.

Once the well was drilled, we needed to obtain a water sample. These results determined that the water was drinkable. We then delivered this to the local Health Dept. for approval. Once we have this approved this and the health department inspected the well head and conducted a pressure test, we had approval to apply for a foundation permit.

We received our foundation permit on the 27th of January. We are re-mobilizing on the site to start the foundation excavation the end of this week.

The photos above attached show the completion of the road past the bend of the road completed, Well rig on site and photo of the site from behind the well. The final photo gives an idea where the Blu Home units will go. The Well truck is where the ‘Evolution’ will be located.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s