Home

IMG_5777In about a half day, our house lift subcontractor had the structure leveled and ready for foundation repairs and shoring.  This single family home on Prospect Hill was constructed about 120 years ago, and is now on the straight and narrow for it’s next 120 years.

IMG_5776

IMG_5774

“Cribbing stacks” were located at key lift points to lift the house approximately 3″ back to level.  Our framers will now place new tapering pressure treated sill boards, creating a long continuous “shim” around 3 sides of the house between the masonry foundation and the old existing 8″ x 8″ sill beam.  This also presents an opportunity to install a capillary break at these 3 sides to further protect the wood frame from moisture that naturally wicks out of the ground and into the masonry.

IMG_5784

IMG_5795

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s